Barcelo Royal Beach, Sunny Beach

  "Aquatech Ltd. participates in construction of swimming pools in Barcelo Royal Beach Hotel, Sunny Beach. The project is a group of three recreational pools with a unique design. Two of them are for adults, one is for children, divided into 2 age zones.

  There is a figurative waterfall "Water mushroom" installed in the children's pool. The adult pools have two separate whirlpool areas, islands, water attractions (built fountains type "Water fingers"). A ramp has been built to the larger one, allowing its comfortable use by persons with limited mobility. All pools have a spectacular lighting for swimming pools.

 Scope of implementation: design, construction, delivery and installation of the technological equipment, all installations, waterproofing and coating of the pools, attraction elements, lighting, hydromassage equipment.

Equipment:Pool; Children's pool
Category: